MODULE 1: Eligibility Period
MODULE 2: Forming the Team
MODULE 3: Feasibility Study
Preferred Schematic Report (PSR) – Submitted on August 29, 2024
Preferred Schematic Report (PSR) – Submitted on August 29, 2024
The project is now in Feasiblity Study, starting with educational programming and intense studying of the existing building and site. The first step in the process was to complete the first submission known as the Preliminary Design Program (PDP) that was submitted to the MSBA for review on April 12. The next step was to work on the Preferred Schematic Report (PSR) which was submitted on August 29. This report summarizes the preferred site and building option.Following these steps and formal approval by the MSBA will be Module 4 – Schematic Design.
March 2025 (date & time TBD)
January 30, 2025
January 14, 2025
December 10, 2024
November 19, 2024
November 12, 2024
October 29, 2024
October 8, 2024
September 10, 2024