Fall Brook Elementary School

Building Project

Document Library

MODULE 1: Eligibility Period

Statement of Interest

Design Enrollment Certification

Feasibility Study Agreement

MODULE 2: Forming the Team

Owner’s Project Manager (OPM) RFS

Owner’s Project Manager (OPM) LeftField’s Response

Designer RFS

Designer RFS MDS’s Response

MODULE 3: Feasibility Study

Preliminary Design Program (PDP) 

Preferred Schematic Report (PSR)

h

Schematic Design Report (SD) – Available Upon Request

PROJECT UPDATES

Construction - Module 7

The project has now completed the Feasibility Study and Detailed Design module, and are now in Module 7 – Construction. This process started with the 60% Construction Documents phase which was completed in late February with a submission of drawings and specifications to the MSBA. The following step will now be 90% Construction Documents, followed by 100% Construction Documents, bidding and then construction. The current schedule has actual construction starting on site in Fall of 2026.