Fall Brook Elementary School

Building Project

Fall Brook School partners with families and the community

to help every student reach their potential

in a safe, welcoming environment

Document Library

MODULE 1: Eligibility Period

Statement of Interest

Design Enrollment Certification

Feasibility Study Agreement

MODULE 2: Forming the Team

Owner’s Project Manager (OPM) RFS

Owner’s Project Manager (OPM) LeftField’s Response

Designer RFS

Designer RFS MDS’s Response

MODULE 3: Feasibility Study

Preliminary Design Program (PDP) 

Preferred Schematic Report (PSR)

h

Schematic Design Report (SD) – Available Upon Request

MONTHLY REPORTS

June 2026

May 2026

April 2026

March 2026

February 2026

January 2026

December 2025

November 2025

October 2025

September 2025

August 2025

July 2025

June 2025

May 2025

April 2025

March 2025

February 2025

January 2025

PROJECT UPDATES

Construction - Module 7

The project has now completed the Feasibility Study and Detailed Design modules, and are now in Module 7 – Construction. This process started with the 60% Construction Documents phase which was completed in late February with a submission of drawings and specifications to the MSBA. The following step was then the 90% Construction Documents, followed by 100% Construction Documents, bidding and then construction. The current schedule has actual construction starting on site in Fall of 2026, with early site and prep work starting in June 2026.