MODULE 1: Eligibility Period
MODULE 2: Forming the Team
MODULE 3: Feasibility Study
Schematic Design Report (SD) – Available Upon Request
Schematic Design Report (SD) – Available Upon Request
The project has now completed the Feasibility Study and Detailed Design module, and are now in Module 7 – Construction. This process started with the 60% Construction Documents phase which was completed in late February with a submission of drawings and specifications to the MSBA. The following step will now be 90% Construction Documents, followed by 100% Construction Documents, bidding and then construction. The current schedule has actual construction starting on site in Fall of 2026.
March 10, 2026
April 14, 2026
May 12, 2026
June 9, 2026
July 14, 2026
August 11, 2026
September 8, 2026
October 13, 2026
November 10, 2026
December 8, 2026
February 24, 2026