Document Library
MODULE 1: Eligibility Period
MODULE 2: Forming the Team
MODULE 3: Feasibility Study
Schematic Design Report (SD) – Available Upon Request
Schematic Design Report (SD) – Available Upon Request
The project has now completed the Feasibility Study and Detailed Design modules, and are now in Module 7 – Construction. This process started with the 60% Construction Documents phase which was completed in late February with a submission of drawings and specifications to the MSBA. The following step was then the 90% Construction Documents, followed by 100% Construction Documents, bidding and then construction. The current schedule has actual construction starting on site in Fall of 2026, also with some early site and prep work that started in June 2026.
November 10, 2026
December 8, 2026
Meeting agendas, minutes and presentations can be found attached to each meeting. All meetings can also be accessed in the Meetings/Events tab.
October 13, 2026
October 6, 2026
September 15, 2026
August 11, 2026
July 14, 2026
June 9, 2026
May 19, 2026
April 14, 2026
March 10, 2026