FBBC: Fall Brook Building Committee

The Fall Brook Building Committee (FBBC) consists of Town and School employees/officials and members of the Community for the purpose of generally monitoring the MSBA Application process and to advise the City of Leominster during the construction of the Project.

MSBA: Massachusetts State Building Authority

MSBA is the authority acting on behalf of the Commonwealth of Massachusetts partnering with Massachusetts communities to support the design and construction of educationally-appropriate, flexible, sustainable, and cost effective public school facilities. MSBA works with municipalities for the life of the project from Pre-Feasibility through Building Completion and Closeout.

PSR: Preferred Schematic Design

PSR is the second reporting stage during the Feasibility Study phase where the District and its team collaborate with the MSBA to refine their educational program and space summary, further develop and evaluate alternatives and recommend the most cost effective and educationally appropriate solution to the MSBA Board of Directors for consideration before progressing into Schematic Design.

SD: Schematic Design

SD is the final reporting stage where the District and its team develop a final design program and robust schematic design of sufficient detail to establish the scope, budget and schedule for the Proposed Project.

RFS: Request for Services

The document utilized to solicit qualifications for Architect and Owner’s Project Manager firms for the project.

MCPPO: Massachusetts Certified Public Purchasing Official

The local official responsible for overseeing procurement of supplies, services, design and construction in accordance with public procurement laws that has been certified by the Massachusetts Office of the Inspector General.

The OPM and Designer are also required to have a dedicated person who is MCPPO certified.

PDP: Preliminary Design Program

PDP is the first reporting stage during the Feasibility Study phase where the District and its team collaborate with the MSBA to document their educational program, generate an initial space summary, document existing conditions, establish design parameters, develop and evaluate alternatives and recommend the most cost effective and educationally appropriate alternatives to the MSBA for further evaluation in the PSR phase.

SOI: Statement of Interest

Submitting an SOI is the critical first step in the MSBA’s program to partially fund the construction, renovation, addition or repair of municipality or regionally owned school facilities located in cities, towns and regional school districts. The SOI allows districts to inform the MSBA about deficiencies that may exist in a local school facility and how those deficiencies inhibit the delivery of the district’s educational program.

PROJECT UPDATES

Feasibility Study - Module 3

The project is now in Feasiblity Study, starting with educational programming and intense studying of the existing building and site. The first step in the process was to complete the first submission known as the Preliminary Design Program (PDP) that was submitted to the MSBA for review on April 12. The next step was to work on the Preferred Schematic Report (PSR) which was submitted on August 29. This report summarizes the preferred site and building option.Following these steps and formal approval by the MSBA will be Module 4  – Schematic Design.

UPCOMING EVENTS

MOST RECENT EVENTS

QUESTIONS

CONTACT US
FAQs